In addition to the construction team, let us understand the construction requirements of the construction site packing box construction.
1. The connecting bolts between the parts must be tightened. 2. Gray line lofting: measure according to the position of the living area plan. 3. The bolts should be installed correctly according to the design requirements, and the gasket should be paved and must be installed.
1. The connecting bolts between the parts must be tightened.
2. Gray line lofting: measure according to the position of the living area plan.
3. The bolts should be installed correctly according to the design requirements, and the gasket should be paved and must be installed.
4. The installation position of each part of the on-site container should meet the design requirements, and the on-site welding parts should be accurate without temporary welding.
5. During on-site welding and transportation, the place where the primer is peeled off should be recoated with anti-rust coating. Apply two coats of finish to the exposed part. There shall be no paint leakage, peeling, painting and rust prevention.
6. The packing box office and walls must be modified according to the layout. The corners and outer corners of the umbrella wall are closed with square aluminum, and the connection between the plates is connected with I-shaped aluminum. Each wall is vertical, embedded to a consistent depth, and must be carefully cleaned.
2022060910042062a1552437d91.jpg
In addition, boxes of houses. Wall column. Other materials shall be durable enough to meet the load-bearing capacity requirements. The packing case shall not use materials explicitly prohibited by the relevant departments. The overall structural bearing capacity and stability of the packaging box manufacturer shall meet the requirements of not being affected in the event of invasion. In addition, the installation company of the packaging box must strictly follow the requirements of the installation and operation manual. Each procedure must be checked and documented by itself. Do not proceed to the installation procedure of the next road when the procedure check is not satisfactory. Use the company to conduct a comprehensive inspection, check qualified, signed and approved by both parties. At the same time, the number of accommodation in each dormitory shall not exceed 8 people.